24 X 7 Security
24 Hours Water Supply
Metro Water
Bore Well
Compounded
SPECIFICATIONS
STRUCTURE
The Structure Is To Be R.c.c. Framed One With Beams, Columns And Slabs According To The Structural Design And Detailed As Per Is:456-2000 And Drawings Approved By The Structural Engineer.
FOUNDATION
Foundation Is To Be Of R.c.c. Column Footing With Excavation - To Match With The Bottom Of Existing Footing Level, Using Tmt Steel Rods Fe415 Or Fe500 And ‘a ‘grade Cements (Birla) As Per Structural Design. Rcc Tie Shall Be Provided At Sill Level.
BASEMENT LEVEL
Basement Height Is To Be 3’0” Feet From The Existing Site Ground Level And To Be Filled With Sand And Properly Consolidated Using Water, The Top Of Basement To Be Laid With P.c.c. 1:4:8 Using 40 Mm Blue Metal.
SUPER-STRUCTURE
Super Structure Is To Be Of Brick Work With Standard Well Burnt Mould Bricks. All 9" Brick Is To Be Done With Cm 1: 5 Using 43 Grade Cement (Birla) And All 4½" Partition Walls Shall Provided With A 4.5" Beam At The Lintel Level Of The Partition Wall. Ceiling Height To Be 10’.
PLASTERING
All Ceiling Is To Be Plastered With Cm 1:3 Using 43 And Walls To Be Plastered With Cm 1:4 Finished Smooth. All External Walls Is To Be Finished Rough.
LINTELS
All Lintels Are To Be Part Lintels With 9" Bearing On Either Side Of The Openings In 9" Walls And 4.5" Bearing On Either Side Of 4.5" Walls As Per Structured Design.
RCC
All Concrete Works Are To Be Cementing Concrete Of M20 Grade. Roof Concrete & Foundation Concrete Alone Will Be Of Ready Mixed Or Machine Mixed And Vibrated Using Needle Vibrators.
Form Work Is To Be A Combination Of Steel Sheets And Wooden Planks With Necessary Runners. Cover Blocks To Be Provided On The Centering To Provide Appropriate Cover To The Roof Slab.
PAINTING
All Internal Walls And Ceilings Are To Be Applied Two Coat "Water Base (Birla) Wall Putty", One Coat Of Primer And Two Coats Of Nippon Paint(Colour Shade Of Owner Choice).
External Wall Is To Be Applied One Coat White Primer And Two Coat Emulsion Nippon Exterior Paint. All Joinery Items Are To Be Painted With One Coat Of Primer And Two Coats Of Enamel Paint Of Approved Color Over One Coat Of Chalk Putty.
Grills Also To Be Painted Two Coats Enamel Finish Main Door And Frame And Is To Be Rubbed And Polished With Varnish Finish.
JOINERY
All Door Frames Are To Be Manufactured With Teak Wood (Second Quality) Except Main Door And Toilet Doors.
One Main Door (3’ 3”x7’0) First Quality Teakwood Frame Is To Be Size Of 5" X 3" And Shuttering Of Teak Wood With Normal Elegant Model.
Other Internal Doors (3’ X7’) Are To Be 30 Mm Thick Flush Doors And Each Door Having Powder Coated Center Lock, 2 Nos. S.s Tower Bolts And Shutters Fixed To The Frame With 3 Nos.
S.s. Hinges. All Toilet Door Frames & Shutter Are Water Proof Doors.
Main Door Is To Be Provided With Center Lock With Handle.
WINDOW
Are Made Of Upvc .
Lofts & Cupboards
Kitchen &bed Rooms - Each 1 Side Of Rcc Open Lofts And Open Cupboard For Size Of 4’x7’ - 1 No. Slabs Are To Be Polished Cuddapah For Kitchen And Rcc Slabs For Bed Rooms.
FLOORING
Flooring Is To Be Provided With 4’ X 2’ Size Vitrified Tiles And Skirting To Be 4" Ht Above The Floor Level. All Toilet Floors To Be 2’ X 2’ Ist Quality Ceramic Anti Skid Tiles Branded.
Car Park Anti Skid Tiles Would Be Installed.
ELECTRICAL POINTS
All Electrical Works To Be Done Using 3/4" And 1" Pipes For Using 3/4" Pipes On Inner Concealed, Orbit Or Equivalent Fire Resistant Wiring And Steel Boxes Are To Be Provided With Plain Anchor Switches. Anchor Roma/ Make.
3 Phase Incomer Distribution Board Of Legrand Make With Mcbs For Circuit Control And L&t Salzer Rotary Switches For Phase Changeover.
PLUMBING
Plumbing Lines Are To Be Provided With ¾, 1" P.v.c. Pipes Of Required Pressure Class Chased And Concealed In The Interior And Open In The Exterior.
Hot Water Lines Are To Be Provided With ¾"Cpvc Pipes. All Pipes Of Branded Isi Make And Two Rainwater Pipes Of 4" Dia With Necessary Fittings Shall Be Provided. Gi Special Clamps To Be Provided For All Open Lines.
Rain Water Harvesting System To Be Implemented In The Building.
SANITARY FIXTURES & FITTINGS
Bath Fixture Are From Jaguar Ewc - For Common Toilet And Ewc For Attached Toilet. Wash Basin 18” X 12” 1 No For Attached Toilet And One Common Wash Basin Near Dining Area.
FITTINGS
For Attached Toilet
Ewc-closet Point -1 ,1 Diverter, Wash Basin Tap Point -1. Taps And Bath Fixtures Are From Jaguar.
For Common Toilet
Ewc Closet Point -1, 1 Diverter, 1 Shower Point. Taps Are From Jaguar.
For Kitchen
1 Sink Tap Point, Aqua Guard Point, 36" X 18” Ss Drain Board Sink
DADOOING
All Toilets Are To Be Dado With I Quality Concept Design Tiles Of Size 12" X 12" For Wall Up To 7 Feet Height, Kitchen Tiles Are Also To Be Dado Using Ist Quality Concept Design Tiles Of Size 12" X 12" Up To 2' 6” Above The Kitchen Top. Kitchen Top Is To Be Of Black Granite.
PARAPET WALL
Parapet Wall Is To Be Constructed With 4 ½" Brick Wall With 9" X 9" Pillars Over Columns Up To 3 Feet Height And Provided With Rings To Dry Clothes.
STAIRCASE AND HANDRAILS (COMMON)
Staircase To Be Constructed Using Brick Work On R.c.c. Waist Slab And Finished With Granite Flooring For Treads And Raisers. Handrails And Balusters Are To Be Provided By S.s Handrail And S.s Runner Pipes. Granite Flooring For Lobby.
WEATHERING COURSE:
4 Inch Weathering Course Heat Resistant Thermal Insulation.
THE FOLLOWING ELECTRICAL POINTS TO BE PROVIDED IN EACH ROOM
1- Entrance
One Bell Point, One Light Point And One 5a Pinpoint.
2- Hall
One T.v. Point One Telephone Point, 3 Light Points.
On Walls. Two 5a And Two Fan Point , One A.c Point.
3- Bedroom
3 Light Points In Wall, One 5a Pinpoint, One Fan.
Point, One Telephone Point & One A.c. Point For.
Each Bedroom .
4- Kitchen
Two Light Points In Wall, Exhaust Fan Point, Two 5a.
Pinpoint For Mixie And Electric Cooker, One 5a Pinpoint For.
Aqua Guard, One 15a Point For Wet-grinder For Grinder And.
Fridge, One 15a Point For Washing Machine In Service Area.
5- Toilet
One Light Point, One 15a Point Each For Geyser.
(Master Bedroom And The Other Bedroom), One Light .
6. Point Over Wash Basin Mirror One 5a Pinpoint.
6- Common Points :
Common Light Points In Stairs, Terrace 2 Nos.
Point For Pump Motor, 3 Light In 3 Sides Of Building.