Site icon Housing News

Mumbai Goa Highway: route map, travel time and construction updates

Mumbai konkan expressway

The much-awaited Konkan Expressway or the new Mumbai Goa Highway, also known as the National Highway-66, is in its final stage and is set to improve travel between Mumbai and Goa significantly. Once completed, it will reduce the Mumbai to Sindhudurg travel time to approximately 6 hours, after which travellers will need an additional 1.5 to 2 hours to reach Goa, making the total journey around 8 hours. Currently, it takes around 12 hours to cover the distance between Mumbai and Goa by road. This six-lane, access-controlled highway, spanning 466 km, will enhance connectivity along the Konkan coast and ease congestion on the existing Mumbai-Goa Highway (NH-66).

Since its inception in 2011, the greenfield konkan expressway has encountered multiple delays due to land acquisition and environmental approvals. However, with progress accelerating, completion is expected soon. Here’s a detailed look at the Konkan Expressway’s status, key features, and impact on Mumbai-Goa travel.

 

Konkan Expressway: Greenfield Konkan Expressway: Key highlights

 

Structure & infrastructure highlights

 

Konkan Expressway progress update

 

Stretch Km  % of Physical work done
Panvel to Indapur 84 92
Indapur to Vadpale 27 67
Vadpale to Bhogaon Khurd 39 100
Bhogaon Khurd to Kashedi 9 97
Kashedi to Parshuram Ghat 42 98
Parshuram Ghat to Arawali 35 94
Arawali to Kante 39 64
Kante to Waked 49 82
Waked to Talgaon 33 100
Talgaon to Kalmath 38 100
Kalmath to Zarap 44 100
Zarap to Patradevi 26 100

About Mumbai Goa Highway

The Mumbai Goa highway is a four-lane highway connecting Panvel in Mumbai with Polem in South Goa. The National Highways Authority of India (NHAI) and the Maharashtra PWD (public works department) is undertaking the improvement and four-laning of the 471.3-km highway (NH-66).

Proposed in 2016, the project has been designed after the renowned San Francisco and Los Angeles roadway. Maharashtra chief minister Eknath Shinde, during the Malvano Mahotsav final event on January 24, 2023, had announced that the project would be a greenfield development featuring access-controlled facilities.

 

Konkan Expressway route map

Once completed, the Konkan Expressway will connect Panvel (Navi Mumbai) to Sindhudurg, covering Raigad and Ratnagiri. The expressway covers 232 villages of 17 talukas and 3 districts of Raigad, Ratnagiri and Sindhudurg. The MSRDC officials have stated that there will be 14 exchanges on the expressway. Furthermore, the Mumbai to goa highway project will cover major cities and towns alongside the western coast. Below is the complete list:

States Cities covered
Maharashtra Panvel
Pen
Nagothane
Kolad
Indapur
Mangaon
Mahad
Poladpur
Khed
Chiplun
Savarda
Sangaeshwar
Hathkhamba
Lanja
Rajapur 
Kankavli
Kudai
Sawantwadi
Sindhudurg
Banda
Goa Pernem
Mapusa
Panjim
Margao
Cuncolim
Canacona

 

Konkan Expressway current status

February 2025: Balavli-Patradevi Konkan Expressway (MSRDC) – 389 km – 6 Lane – Revised DPR ready.

 

 

January 2025: The expressway is nearing completion, with 95% of the work finalised. 

 

 

October 2024: The Rs 26,000 crore Marine Superhighway project officially commenced, running parallel to the existing Goa highway.

 

 

August 2024: The Maharashtra government proposed the 376-km, six-lane Konkan Expressway to connect Mumbai and Goa, aiming to cut travel time to 6 hours. ​

 

 

August 2020: MSRDC invited tenders to prepare the Detailed Project Report (DPR) for the expressway, dividing the project into four sections, each spanning 100-125 km. 

 

 

2011: Construction of the Konkan Expressway began, facing challenges like land acquisition and cost overruns.

 

As of February 2025, the Konkan Expressway is nearing completion, with approximately 95% of construction finalized. 

 

What’s causing the delay in the Konkan Expressway completion?

​The Konkan Expressway project has encountered several delays due to various challenges:​

  1. Environmental concerns: The project has delayed obtaining necessary environmental clearances, mainly due to its proximity to eco-sensitive zones.
  2. Land acquisition hurdles: Securing land for the expressway has been a significant challenge, leading to project delays. ​
  3. Contractor performance issues: Subpar work by contractors has resulted in project delays, necessitating reassignments and further prolonging completion timelines. ​
  4. Regulatory and legal challenges: The Bombay High Court has expressed concerns over initiating new projects like the Konkan Expressway without completing existing ones, such as the Mumbai-Goa Highway, leading to legal hurdles and delays. ​
  5. Political and administrative factors: Political disagreements and administrative inefficiencies have contributed to the project’s slow progress, affecting decision-making and coordination.

 

How to travel from Sindhudurg to Goa? Best routes and estimated time

since the expressway terminates in Sindhudurg, travellers aiming for Goa will need to cover the remaining distance through alternative routes.

 

Travelling from Sindhudurg to goa:

 

Estimated total travel time from Mumbai to Goa via Konkan Expressway

 

Total estimated time: Combining these segments, the total travel time from Mumbai to Goa via the Konkan Expressway is around 7 hours and 48 minutes.

 

Konkan Expressway travel time

The Konkan Expressway will reduce the travel time between Mumbai and Goa to about 8 hours. The approximate time for motorists to commute between the two states is 12 hours. The shorter travel time is mainly due to the expected reduction in the journey between Mumbai and Sindhudurg from 10 to 8 hours once the Konkan Expressway is completed.

 

Tunnels and bridges

The Konkan Expressway will bring significant infrastructure elements, such as tunnels and bridges, to navigate the difficult terrain of the Konkan region. The Konkan Expressway will feature approximately 41 tunnels and 21 major bridges. Additionally, the route will have 41 smaller bridges across various districts.

 

Estimated cost

According to reports, an estimated Rs 68,000 Cr is set for the construction of the Konkan Expressway. This covers the acquisition cost of approximately 3,792 hectares of land. Of this, approximately 146 hectares are under the jurisdiction of the forest department.

Is Konkan expressway a part of Mumbai Goa highway?

The Konkan Expressway is a proposed six-lane, access-controlled highway designed to connect Panvel in Navi Mumbai to Sindhudurg, passing through the districts of Raigad and Ratnagiri. This expressway aims to reduce the travel time between Mumbai and Goa to approximately six hours.

In contrast, the existing Mumbai-Goa Highway, known as National Highway 66 (NH-66), is currently undergoing expansion to a four-lane configuration. This highway also connects Mumbai to Goa but follows a different route compared to the proposed Konkan Expressway.

Therefore, the Konkan Expressway is not a part of the existing Mumbai-Goa Highway; rather, it is a separate, planned infrastructure project intended to provide an alternative and faster route between Mumbai and Goa.

 

Intersection points of Konkan Expressway with Mumbai-Goa highway

The Konkan Expressway and the Mumbai-Goa Highway (NH-66) are distinct routes designed to enhance connectivity between Mumbai and Goa. While they are separate, there are planned intersections to facilitate smoother travel.

Key intersection points:

 

Konkan Expressway features

The much-awaited Konkan Expressway possesses several advantageous features because of which commuters are expecting its swift completion. The Konkan Expressway will drastically reduce travel time, enhance connectivity and support economic growth. Here are some key features of the Konkan Expressway:

Feature Details
Length Approximately 376 kilometres.
Lanes Six-lane access-controlled highway.
Route Connects Panvel (Navi Mumbai) to Sindhudurg, passing through Raigad and Ratnagiri.
Travel Time Reduction Expected to reduce Mumbai-Goa travel time from 12-13 hours to about 6 hours.
Estimated Cost Approximately Rs. 68,000 crore.
Land Acquisition Requires around 3,792 hectares, including 146 hectares of forest land.
Interchanges A total of 14 interchanges are planned along the route.
Infrastructure Features Includes 41 tunnels and 21 significant bridges to navigate the Konkan region’s terrain.
Completion Timeline Targeted for completion by June 2025. (Still under construction)

 

Mumbai-Goa route via Konkan Expressway

Route overview:

Key features:

Konkan Expressway completion date

The Konkan Expressway has seen recurrent changes in the completion date due to multiple delays. The three main reasons are this are contractor issues, land acquisition, and environmental issues. While there has been no official announcement of a completion date, the much-awaited project is set for completion in June 2025.

Why is Konkan Expressway important?

The Konkan Expressway is one of the much-awaited projects that is being built to reduce travel time between Mumbai and Goa. As the route has heavy traffic, currently it takes between 12-14 hours to travel to Goa from Mumbai via the Mumbai-Goa Highway (NH 66).

Once complete, the Konkan Expressway will cut down this travel time to 6 hours. It will reduce the travel time between Mumbai and Sindhudurg from 6 to 3 hours, significantly speeding up the commute between the two states. The Expressway will enhance connectivity to smaller towns and villages in the Konkan region, which will boost trade in the region, which is popular for its agriculture and fisheries.

 

Difference between Mumbai goa expressway and Konkan expressway

The Mumbai-Goa Expressway and Konkan Expressway are often confused, but they are different:

 

Konkan expressway vs. Other Mumbai-Goa Highways: Which route is best?

Feature Konkan Expressway Mumbai-Goa Highway (NH-66) Mumbai-Goa Coastal Highway
Type Access-controlled expressway National Highway Coastal highway
Length 389 km 471 km ~500 km
Route Mumbai (Panvel) – Sindhudurg – Goa Mumbai – Pen – Chiplun – Sawantwadi – Goa Mumbai – Coastal towns of Konkan – Goa
Purpose High-speed connectivity Existing highway being widened Scenic travel & tourism
Number of Lanes 6 lanes 4–6 lanes (widening ongoing) 4 lanes (planned)
Estimated Travel Time Under 6 hours 7-10 hours (depends on congestion) 8+ hours (due to coastal terrain)
Major Features 41 tunnels, 21 bridges, 14 interchanges Widening project, connects multiple Konkan towns 7+ bridges over creeks, sea-facing route
Completion Status DPR completed, awaiting approvals Widening ongoing, some stretches complete Proposed, early-stage approvals
Key Users Freight transport, long-distance travelers General traffic, buses, and trucks Tourists, leisure travelers
Traffic Congestion Minimal (access-controlled) High (frequent jams, slow-moving traffic) Moderate (depends on tourist season)
Economic Impact Logistics boost, investment hub Supports local businesses Boosts coastal tourism
Challenges Land acquisition, environmental clearance Slow widening process, contractor delays Expensive construction due to terrain

 

 

Impact of Konkan Expressway on real estate

Rise in property values

The Konkan Expressway will increase property values adjacent to the expressway. Experts see this as an excellent opportunity for commercial, industrial, and residential development. Since the announcement of the new completion date for the Mumbai-Goa expressway Expressway, the demand for properties, such as farmhouses and residential plots, has increased. , with Raigarh witnessing the most significant increase at about 25%. 

 

Seamless connectivity will make the adjacent areas adjacent to the Mumbai goa highway attractive for commercial, industrial, and residential uses. Hence, a significant rise is expected.

 

Industrial zones and commercial hubs

Enhanced connectivity of the Konkan expresswayExpressway will increase demand for real estate, including properties like office spaces, warehouses, and industrial complexes. Consequently, this growth can lead to various job opportunities and the development of industrial zones and commercial hubs along the expressway.

 

Tourism and hospitality

As the Konkan expresswayExpressway project nears completion, the tourism and hospitality sector is also expected to grow substantially. More and more hotels, resorts, and homestays will be in demand, stimulating investment in the hospitality sector.

 

How Konkan expressway will impact various industries?

The Konkan Expressway is poised to significantly bolster various industries in the region, notably agriculture, fisheries, and manufacturing.

Agriculture

The Konkan region is renowned for its diverse agricultural produce, including cashews, mangoes, and rice. Enhanced connectivity through the expressway will facilitate faster and more efficient transportation of these perishable goods to major markets in Mumbai, Goa, and beyond. This improvement is expected to reduce spoilage, lower transportation costs, and increase profit margins for farmers. Additionally, the expressway may attract investment in agro-processing units, adding value to raw produce and creating employment opportunities.

Fisheries

Fisheries are a vital component of the Konkan economy. The expressway will enable quicker transport of fresh seafood to urban centers, preserving quality and fetching better prices. Improved infrastructure can also lead to the development of cold storage facilities and processing units along the route, enhancing the supply chain’s efficiency. Furthermore, better access may encourage tourism in coastal areas, providing an additional market for local fishermen.

Manufacturing

Manufacturing industries stand to gain from the reduced travel time and improved logistics that the expressway offers. Easier access to raw materials and markets can lower production costs and increase competitiveness. The expressway may also stimulate the establishment of new industrial zones along its corridor, attracting both domestic and foreign investment. This development can lead to job creation and economic diversification in the region.

 

Mumbai Goa Highway: Contact information

Citizens can reach out on the following phone number, email id and address for any query or feedback about the project:

Phone number: 91-011-25074100, 25074200, 91-011-25093507, 25093514   

Email ID: www.nhai.gov.in

Office address: National Highways Authority of India (NHAI), G 5&6, Sector 10, Dwarka, New Delhi – 110075

 

Housing.com POV

The Konkan Expressway is a transformative infrastructure project that promises to redefine connectivity and economic dynamics between Mumbai and Goa. While delays have marred the journey to its completion, the anticipation surrounding its benefits—reduced travel time, improved logistics, and enhanced regional development—is palpable. The expressway is poised to unlock immense potential for industries like tourism, agriculture, and real estate, fostering economic growth and creating job opportunities. As the project progresses, it reflects an engineering feat and a commitment to regional progress and connectivity. The Konkan Expressway isn’t just a road; it’s a gateway to new opportunities and accelerated development for the Konkan region.

Got any questions or point of view on our article? We would love to hear from you.Write to our Editor-in-Chief Jhumur Ghosh at jhumur.ghosh1@housing.com

FAQs

What is the Konkan Expressway?

The Konkan Expressway is a project that will connect Mumbai and Goa and reduce the travel time between the states to 6 hours.

How long is the Konkan Expressway?

The Konkan Expressway is 376 km long and connects Panvel (Navi Mumbai) and Sindhudurg via Raigad and Ratnagiri.

What is the estimated cost of the Konkan Expressway?

According to the reports, an estimated cost of Rs 68,000 Cr is set for the construction of the Konkan Expressway.

What are some key features of the Konkan Expressway?

The expressway will include around 41 tunnels, 21 major bridges, and 41 smaller bridges to navigate the diverse terrain of the Konkan region.

What is the Greenfield Konkan Expressway route?

The Konkan Expressway will connect Navi Mumbai, Panvel, Pen, Alibaug, Raigad, Mangaon, Mahad, Chiplun, Ratnagiri, Kankavli, Sawantwadi and Goa.

When is the Konkan Expressway expected to be completed?

The expected completion date is June 2025.

What is the current status update on of the Konkan Expressway?

Currently, the MSRDC is seeking environmental clearance from the Ministry of Environment Forest and Climate Change (MOEF&CC)

Was this article useful?
  • ? (1)
  • ? (0)
  • ? (0)
Exit mobile version