This will aid in seamless change of mode of transport with the subway being connected with underground pathway access with Aqua Line 3.
Anuradha RamamirthamDec 2022
Following the collapse of a road overbridge in Andheri, Western Railway has asked the Mumbai civic body to repair or re-construct six bridges along its route, after a safety audit
PTIJul 2018
While Phase 1 is operational, work is on Phase 2 and work on Phase 3 of the Mumbai Coastal Road is expected to start by August 2025.
Anuradha RamamirthamMay 2025
The Jatia House was purchased by Kumar Mangalam Birla for Rs 425 Cr.
Harini BalasubramanianJan 2025
Jhunjhunwala paid over Rs 59 lakh for stamp duty and registration charges.
Dhwani MeharchandaniMar 2024
It will be opened for the public from March 12.
Anuradha RamamirthamMar 2024
It is also known as Vilasrao Deshmukh Eastern Freeway and is 16.8 km long.
Shimon OberoiNov 2023
Check out the list of posh areas in Mumbai and its suburban regions that is known for housing celebrities, millionaires and businessmen. Also know about the most expensive area in Mumbai.
Anuradha RamamirthamOct 2023
Mhada to issue notices under the newly introduced clause 79(A) of the Mhada Act, 1976.
Anuradha RamamirthamAug 2023
Following the notice, 155 residents have made alternate residential arrangements.
Anuradha RamamirthamJun 2023
Situated in Worli, this luxury residential development offers a range of amenities.
Housing News DeskMay 2023
The Rs 1,000-crore investment will be done entirely through internal accruals.
Housing News DeskMay 2023
These buildings will be redeveloped under Development Control Regulation (DCR) section 33(7) with an FSI of 3 or an additional incentive FSI of minimum 78%
Anuradha RamamirthamNov 2022