Mumbai Metro Line 3 map, Aqua Line route, stationsThe entire Mumbai Metro Line 3 will start operations in second week of October 2025.
Anuradha RamamirthamMay 2025
Mumbai Metro Line 3 closer to operational phaseMumbai Metro Line 3 will be opened in three phases.
Anuradha RamamirthamMay 2024
Mumbai Metro Line-3 is 81.3% complete, says MMRCLThis is Mumbai’s first underground metro and will connect South Mumbai to the Western suburbs.
Anuradha RamamirthamMay 2023
Construction work to connect Mumbai Metro line 3 with CSMT subway startsThis will aid in seamless change of mode of transport with the subway being connected with underground pathway access with Aqua Line 3.
Anuradha RamamirthamDec 2022
Old Mumbai: A look at old Bombay to Mumbai in photosFrom a sleepy Koli fishing hamlet to the financial capital of India, Mumbai has come a long way. Here is a look at this iconic journey of Mumbai in photos
Housing News DeskJun 2022
Luxury home prices in Mumbai expected to fall by 1% in 2020: ReportMumbai’s luxury homes market is likely to witness a price correction of 1% in 2020, even though the city ranked seventh globally in terms of expected rise in luxury home prices, says a report by Knight Frank
Housing News DeskDec 2019
Luxurious and colourful: Designer Maheka Mirpuri's homeDesigner Maheka Mirpuri's spacious home in Mumbai's Cuffe Parade blends colours, furniture, flowers, and artifacts, to create a décor that is luxurious and contemporary
Purnima Goswami SharmaJan 2019
No night-time metro construction work in south Mumbai area, until MPCB files noise pollution report: HCThe Bombay HC has asked the state's pollution control board to record noise levels near the metro rail site at Cuffe Parade and restricted any metro construction activity during the night, till the pollution board files its report
PTIJul 2018
Mumbai Metro seeks permission to carry out work at night on Line IIIStating that the tunnel-boring work in Cuffe Parade could only be done at night, when the traffic was minimal, the Mumbai Metro has sought the high court's permission to carry out construction work round-the-clock
PTIJun 2018
Decibel levels of three metro work spots recorded: Maharashtra to Bombay HCThe Maharashtra government has informed the Bombay HC that it has recorded the decibel levels at three construction sites of the Mumbai Metro III line and sent the readings to the state pollution control board, for further action
PTIJun 2018
Mumbai Metro work: HC seeks to know if noise pollution norms were violatedThe Bombay HC has directed the state government to file an affidavit, stating whether it intends to take any action against the Mumbai Metro Rail Corporation, in case there is any violation of noise level norms in the construction of the Metro III corridor
PTIApr 2018
HC directs police to check noise levels at three Mumbai Metro sitesThe Bombay High Court has directed the police to conduct checks at construction sites of the Mumbai Metro III corridor in Churchgate, Cuffe Parade and Mahim, to ascertain the noise levels due to the construction
PTIApr 2018
File affidavit showing that norms were flouted: HC on Aarey car shedThe Bombay High Court has directed a group of activists, opposing the construction of the proposed metro car shed in Aarey Colony area, to file an affidavit supporting their claim that the Maharashtra government flouted environmental norms in approving the construction work
PTIApr 2018




















