Delhi road projects worth over Rs 60k cr to be ready by 2023

The eight-lane Dwarka Expressway will be operational by August 2023. The 1,380-km Delhi Mumbai Expressway is scheduled for inauguration in January 2023.

Delhi is set to witness improved road connectivity as four expressways – Dwarka Expressway, Delhi-Mumbai Expressway, Delhi-Dehradun Expressway, and Urban Extension Road – will be ready in 2023. Once operational, the expressways will ease traffic in and around the National Capital Region. Moreover, the construction of three flyovers and underpasses in the city is underway. Aimed at tackling Delhi’s traffic problems, the central government is developing projects worth Rs 60,000 crore.

know about: peripheral ring road bangalore

The four expressways will boost connectivity to major cities in 2023:

Dwarka Expressway

Construction on the eight-lane expressway is expected to complete by August 2023. The 29-km expressway is being built with the aim of reducing traffic jams around the Delhi-Haryana border. The expressway route is close to Highway 48 between Delhi and Jaipur.

See also: Dwarka expressway’s Gurgaon section to be operational by early 2023

 

Delhi Mumbai Expressway

The 1,380-km expressway will connect Delhi and Mumbai. Once operational, it will cut down the travel time from 24 hours to 12 hours and reduce traffic congestion in Delhi and NCR. It will be linked to the eastern and western peripheral expressways. A connection road is being developed between Delhi and Mumbai from the Ashram underpass. The expressway is scheduled for inauguration on January 26, 2023.

See also: Delhi Mumbai Expressway map, route, completion date, and construction status

 

Delhi Dehradun Expressway

It is a 210-km long expressway, developed with an estimated cost of around Rs 13,000 crore. The route covering a 14-km section in Delhi and the 12-km stretch in Ghaziabad will have 12 lanes. It will reduce the travel time between Delhi and Dehradun by four hours.

See also: Delhi Dehradun Expressway: Construction details, phases, and current status

 

Urban Extension Road

The 75.6-km long Urban Extension Road 2 will link the IGI Airport to the Delhi-Chandigarh, Delhi-Dwarka, and Delhi-Mumbai Expressways. Commuters need not travel via Delhi to go to reach other places once this road is operational by 2023 end.

The three major flyovers that will be operational in 2023 include:

  • Ashram Flyover: The Ashram Flyover and DND will be connected to ease travel from Ghaziabad to Noida and resolve traffic bottlenecks. It will cut down traffic at the Ashram.
  • Sarai Kale Khan Underpass: The underpass is being developed near Sarai Kale Khan and will ease traffic on the ring road between ITO and Ashram. The project will be completed by October 2023.
  • Apsara Flyover: Construction of the flyover, which will connect the Apsara border to the Anand Vihar overbridge, is underway and is expected to be completed by December 2023.
Was this article useful?
  • 😃 (0)
  • 😐 (0)
  • 😔 (0)

Recent Podcasts

  • Keeping it Real: Housing.com podcast Episode 47Keeping it Real: Housing.com podcast Episode 47
  • Keeping it Real: Housing.com podcast Episode 46Keeping it Real: Housing.com podcast Episode 46
  • Keeping it Real: Housing.com podcast Episode 45Keeping it Real: Housing.com podcast Episode 45
  • Keeping it Real: Housing.com podcast Episode 44Keeping it Real: Housing.com podcast Episode 44
  • Keeping it Real: Housing.com podcast Episode 43Keeping it Real: Housing.com podcast Episode 43
  • Keeping it Real: Housing.com podcast Episode 42Keeping it Real: Housing.com podcast Episode 42