The Mumbai Metro Line 12 that covers Kalyan-Dombivli-Taloja Line is also known as the extension of Orange Line. It will cover 22.17-km-long. This metro will have 19 elevated stations. The Mumbai Metropolitan Region Development Authority (MMRDA) will be executing the Mumbai Metro Line 12.
Name | Mumbai Metro Line 12 /Orange Line |
Length | 22.17 km |
Stations | 19 |
Metro type | Rapid Transit Metro System |
Project cost | Rs 5,865 crore |
Construction type | Elevated corridor |
Operator | MMRDA |
When did construction start for Mumbai Metro Line 12?
Maharashtra chief minister Eknath Shinde on March 3, 2024 laid the foundation stone of the Mumbai Metro Line 12.
When will Mumbai Metro Line 12 be completed?
Mumbai Metro Line 12 is expected to be completed by 2026.
Mumbai Metro Line 12: Project cost status
The Mumbai Metro Line 12 is pegged at Rs 5,865 crore.
Mumbai Metro Line 12: Timings
Although it’s early to decide on timings, Mumbai Metro Line 12 is expected to ply from 6 AM to 11 PM everyday once the metro line is operational.
Mumbai Metro Line 12: Fare
Mumbai Metro Line 12: Benefits
- Travel time between Kalyan and Taloja will be reduced to 45 minutes with the Mumbai Metro Line 12.
- According to the detailed plan report (DPR) prepared by the Delhi Metro Rail Corporation (DMRC), this metro line will pass through barren and agricultural land. It will help in decongesting Mumbai city and encourage development activities in the area covered by this line.
Mumbai Metro Line 12: List of stations
- Kalyan APMC
- Kalyan
- Ganesh Nagar (Kalyan)
- Pisavali Gaon
- Golavali
- Dombivali MIDC
- Sagaon
- Sonarpada
- Manpada
- Hedutane
- Kole Gaon
- Nilje Gaon
- Vadavali
- Bale
- Waklan
- Turbhe
- Pisarve Depot
- Pisarve
- Amandoot (Taloja)
Â
Mumbai Metro Line 12: Interchanges
The Mumbai Metro Line 12 has two interchanges:
- With Mumbai Metro Line 5 at Kalyan APMC
- With Navi Mumbai Metro Line 1 at Amandoot
Â
Mumbai Metro Line 12: Real estate impact
While planning the Mumbai Metro Line 12, there are also projects planned in the route that the metro line will pass which will have a deep impact on the real estate in these places. The prime areas through which the metro line will pass are Kalyan, Dombivli and Taloja.
The upcoming projects around the Mumbai Metro 12 include:
- Buildings by private developers
- Kalyan Growth Centre
- Â Navi Mumbai Airport Influence Notified Area (Naina)
Housing.com POV
Properties that are located close to any public transport system offer convenience to people who stay there and hence they command a premium price. The Mumbai Metro Line 12 passes through Kalyan, Dombivli and Taloja segment that is a heavy real estate area. While demand in these areas have always been there, with the metro convenience, the real estate prices in this area is expected to surge further.
Â
FAQs
What is the Mumbai Metro Line 12 also called as?
The Mumbai Metro Line 12 is also called as Orange Line extension.
How many stations are there in Mumbai Metro Line 12?
There are 19 stations in Mumbai Metro Line 12.
How many interchanges are there in Mumbai Metro Line 12?
There are two interchanges – one in Kalyan APMC with Mumbai Metro Line 5 and one in Amandoot Taloja with Navi Mumbai Metro Line 1.
When is the Mumbai Metro Line 12 likely to be completed?
The Mumbai Metro Line 12 is likely to be completed by 2026.
When was the foundation stone laid for Mumbai Metro Line 12?
The Mumbai Metro Line foundation stone was laid on March 3, 2024.
Got any questions or point of view on our article? We would love to hear from you. Write to our Editor-in-Chief Jhumur Ghosh at jhumur.ghosh1@housing.com |