All about Pune Bangalore Expressway

The project is expected to be completed by 2028.

Pune Bangalore Expressway

National Highways Authority of India (NHAI) has proposed the construction of the Pune Bangalore Expressway under the Bharatmala Pariyojna.  The 40,000 crore project is expected to be completed by 2028.

Pune Bangalore Expressway: Key facts

Name Pune Bangalore Expressway
Type Greenfield Expressway
Length of Expressway 745 km
Lanes 8
To be under National Highway Authority of India (NHAI)
Project cost Rs 40,000 crore
Speed limit 120 km per hour

Pune Bangalore Expressway: Land acquisition

According to a Deccan Herald report, the NHAI has mentioned that nearly 2,000 acre of green fields in Karnataka including 383 acre forest land are needed for the Pune Bangalore Expressway construction. The Environment Impact Assessment (EIA) of the project is yet to be finalised, as per the report. Also, it mentioned that NHAI officials estimate felling of 25,000 trees, 60% of which is in Karnataka.

This greenfield expressway is expected to be a faster alternative to the existing National Highway 48 (the old NH4) and will reduce the traffic and congestion experienced here. Supporting a speed of 120 km/hr, the new Pune Bangalore Expressway will be a six-lane access controlled expressway. The distance between Pune and Bangalore will be reduced by 95 km. It will reduce the travel time between Pune and Bangalore to 7 to 8 hours as compared to the existing 11 to 12 hours.

 

Pune Bangalore Expressway: Cost of the project

The 745-km-long Pune Bangalore Expressway will be constructed at an expense of around Rs 40,000 crore.

Pune Bangalore Expressway: Route

The six-lane asphalted greenfield Pune Bangalore Expressway will start from Varee Budruk. In Maharashtra, the Pune Bangalore Expressway will pass through drought-prone areas of Satara and Sangli districts – Khandala, Phaltan and Khatao in Satara district and Khanapur, Tasgaon and Kavathe Mahankal localities in Sangli district.

In Karnataka, the Pune Bangalore Expressway will pass through Belagavi, Bagalkot, Gadag, Koppal, Ballari, Davangere, Chitradurga, Tumkur and then connect to Bangalore.

Pune Bangalore Expressway: Project plan

Many sections of the existing 849-km highway get submerged during the monsoons, thereby, affecting travel. The new Pune Bangalore Expressway will be designed in such a way that no section is flooded at any time.

The Pune Bangalore Expressway will have two airstrips of 5 kms each for emergency landing purposes for aircrafts. The Pune Bangalore Expressway will include amenities like restrooms, hotels and play areas for children and trees will be planted alongside the Greenfield highway.  The Pune Bangalore Expressway will have vehicles plying at a maximum speed of 120 km per hour. As it is planned to be 100 metres in width, the Pune Bangalore Expressway will be bigger than the Mumbai Pune Expressway.

Check out: Pune flat on rent

Pune Bangalore Expressway: Status

Presently in the proposal stage, work has not yet commenced on the Pune Bengaluru expressway project. Once a detailed project report (DPR) is made, the land acquisition for this Greenfield project will start.

Know about: Kharadi pune pin code 

Pune Bangalore Expressway: Rivers that will be crossed

  • Agrani
  • Chikka Hagar

  • Chand Nadi

  • Nira

  • Yerala

  • Krishna

  • Ghataprabha

  • Malaprabha

  • Tungabhadra

  • Vedavathi

Pune Bangalore Expressway: Infrastructure

The Pune Bangalore Expressway will include 6 Road Over Bridges (ROBs), 22 Interchanges, 55 Flyovers, 14 National and state highway crossing points, tree plantation on both sides of the Expressway.

Pune Bangalore Expressway: Impact on real estate

While the travel time will be reduced, the expressway will also help in development of areas such as Nashik, Kolhapur and Satara. These areas which are known to be manufacturing hub will see improved facilities and more employment. With people, there will be a rise in real estate activity in the areas through which the expressway will pass.

FAQs

What is the savings in time with the new Pune Bangalore expressway?

The new Pune Bangalore Expressway will reduce travel time by four to five hours.

What is the length of Pune Bangalore Expressway?

The length of Pune Bangalore Expressway is around 745 km.

What are the districts through which the Pune Bangalore Expressway will pass?

The Pune Bangalore Expressway will pass through Pune, Sangli and Satara.

How many rivers will be crossed between Pune and Bangalore?

Around 10 rivers will be crossed between Pune and Bangalore by the Pune Bangalore Expressway.

When was the Pune Bangalore Expressway announced?

The Pune Bangalore Expressway was announced in 2020-21 but construction has not yet started.

Got any questions or point of view on our article? We would love to hear from you. Write to our Editor-in-Chief Jhumur Ghosh at jhumur.ghosh1@housing.com

 

 

Was this article useful?
  • ? (2)
  • ? (1)
  • ? (0)

Recent Podcasts

  • Keeping it Real: Housing.com podcast Episode 62Keeping it Real: Housing.com podcast Episode 62
  • Keeping it Real: Housing.com podcast Episode 61Keeping it Real: Housing.com podcast Episode 61
  • Keeping it Real: Housing.com podcast Episode 60Keeping it Real: Housing.com podcast Episode 60
  • Keeping it Real: Housing.com podcast Episode 59Keeping it Real: Housing.com podcast Episode 59
  • Keeping it Real: Housing.com podcast Episode 57Keeping it Real: Housing.com podcast Episode 57
  • Keeping it Real: Housing.com podcast Episode 58Keeping it Real: Housing.com podcast Episode 58