Bangalore Metro Orange line: Proposed stations, route map, fare

The Bangalore Metro Orange line will ensure smoother connectivity across the city.

Bangalore Metro Rail Corporation Limited (BMRCL) is all set to uncover phase 3A of the Bangalore Metro Orange line. The metro line will cover an extensive distance of 44.65 km with two different corridors. The Orange line of Bangalore Metro is expected to be constructed with a budget of Rs 16,328 crore. The project will have 21 stations in corridor 1 and 9 stations in corridor 2 and will be launched in 2028. 

Also read: Mohan Estate Metro Station Delhi

Bangalore Metro Orange line opening

The construction of the Bangalore Metro Orange line is underway and the line is expected to be operational by 2027-28. The metro line will cover 21 stations in Corridor 1 and an additional 9 stations in Corridor 2. 

Also read: ITO Metro Station Delhi

Bangalore Metro Orange line proposed stations

The Bangalore Metro Orange line is going to cover a total of 31 km along the Outer Ring Road. The corridor will stretch from Kempapura to JP Nagar covering 22 stations. Whereas, corridor 2 will extend from Hosahalli Toll to Kadabagere with 9 stations. Go through the table below to know about the proposed stations for the orange line of Bangalore Metro. 

 

Bangalore Metro Orange line stations – Corridor 1
JP Nagar IV Phase (JD Mall) (Pink Line)

JP Nagar V Phase

JP Nagar (Green Line) 

Kadirenahalli

Kamakya Bus Depot

Hosakerahalli Cross

PES Institute of Technology

Mysuru Road (Purple Line) 

Nagarbhavi Circle

Vinayaka Layout

Dr. Ambedkar Institute of Engineering

Nagarbhavi BDA Complex

Sumanahalli Cross (Hosahalli-Kadabagere Line)

Chowdeshwari Nagar

Freedom Fighters Cross

Kranteevera Studio

Peenya (Green Line) 

Bahubali Nagar

BEL Circle

Patelappa Layout

Hebbal (Hebbala Suburban Railway Station)

Kempapura (Blue Line)

Bangalore Metro Orange line stations – Corridor 2
Hosahalli (Purple Line) 

K H B Colony 

Vinayaka Nagara

Sumanahalli Cross (Orange Line) 

Sunkadakatte

Herohalli

Bydarahalli

Forest Gate

Kadabagere

Real estate impact of Bangalore Metro Orange line

The Bangalore Metro Orange line is expected to bring a positive impact on the real estate of the city. The metro line will have an uptick in the property value near the location. It will also bring about a surge in the demand for housing in the surrounding areas. Additionally, the Orange Line will also attract businesses, thus boosting the city’s economy. Finally, the Bangalore Metro Orange line will improve connectivity in the city and reduce the city’s traffic congestion.

 

FAQs

What is the distance of Bangalore Metro’s Orange Line?

The orange line in the Bangalore metro is going to have a 31 km route with 21 planned stations in corridor one and nine stations in corridor two.

Which phase of metro construction does the Orange Line fall under?

The orange line in Bangalore is phase 3A of the Namma Metro Project.

Which is the new metro line of Namma Metro?

The purple line and orange line are the new metro lines that are being assigned under the Bangalore metro project.

What lines of the Bangalore Metro are currently operational?

Presently, the purple and green lines are operational in the Bangalore Metro project whereas the Orange line is proposed to be operational soon.

Which is the first station of the Orange Line?

Jayaprakash Nagara Phase 4 is the first station of the Bangalore Metro Orange Line.

When is the Bangalore Metro Orange line expected to start?

The Bangalore Metro Orange line is expected to launch in 2027-2028.

How many stations are proposed under the Bangalore Metro Orange line?

Presently, 21 metro stations are proposed for corridor 1 and 9 metro stations are proposed for corridor 2 under the Bangalore Metro Orange line.

Got any questions or point of view on our article? We would love to hear from you. Write to our Editor-in-Chief Jhumur Ghosh at jhumur.ghosh1@housing.com

 

Was this article useful?
  • 😃 (0)
  • 😐 (0)
  • 😔 (0)

Recent Podcasts

  • Keeping it Real: Housing.com podcast Episode 45Keeping it Real: Housing.com podcast Episode 45
  • Keeping it Real: Housing.com podcast Episode 44Keeping it Real: Housing.com podcast Episode 44
  • Keeping it Real: Housing.com podcast Episode 43Keeping it Real: Housing.com podcast Episode 43
  • Keeping it Real: Housing.com podcast Episode 42Keeping it Real: Housing.com podcast Episode 42
  • Keeping it Real: Housing.com podcast Episode 41Keeping it Real: Housing.com podcast Episode 41
  • Keeping it Real: Housing.com podcast Episode 40Keeping it Real: Housing.com podcast Episode 40