Mumbai Coastal Road Phase-1 to open January end 2024: Maha CM

The first phase is around 10.58 km.

December 12, 2023: The Phase-1 of the Mumbai Coastal Road will be operational by the end of January 2024, mentioned Maharashtra chief minister, Eknath Shinde at an event.

The first phase is around 10.58 km and has been constructed between Marine Drive and Worli in South Mumbai.

The Mumbai coastal road connects South Mumbai to the western suburbs – Marine Drive to Kandivali through the existing Bandra Worli Sea Link.  With this in place, the traffic woes in this area will be addressed.

Other key project that will become operational soon is the Mumbai Trans Harbour Link Road that will enable travel of around 22 km in 15 minutes as opposed to the two hours presently.

 

Got any questions or point of view on our article? We would love to hear from you. Write to our Editor-in-Chief Jhumur Ghosh at jhumur.ghosh1@housing.com

 

Was this article useful?
  • ? (0)
  • ? (0)
  • ? (0)

Recent Podcasts

  • Keeping it Real: Housing.com podcast Episode 86Keeping it Real: Housing.com podcast Episode 86
  • Keeping it Real: Housing.com podcast Episode 85Keeping it Real: Housing.com podcast Episode 85
  • Keeping it Real: Housing.com podcast Episode 84Keeping it Real: Housing.com podcast Episode 84
  • Keeping it Real: Housing.com podcast Episode 83Keeping it Real: Housing.com podcast Episode 83
  • Keeping it Real: Housing.com podcast Episode 82Keeping it Real: Housing.com podcast Episode 82
  • Keeping it Real: Housing.com podcast Episode 81Keeping it Real: Housing.com podcast Episode 81